Dated events only, and where the record runs thin

Boca Raton water history

Boca Raton's water story runs from an early plant to a large nanofiltration and lime softening complex, a major reuse system and, now, PFAS treatment. This timeline lists only events we found a dated source for. The early record is thin, and we say where.

Last reviewed November 20, 2026 against the cited sources.

Updated . Sources

How we built it

Each row has a date and a source. When sources disagree we show both. For the early decades we found very little: no utility founding date, and no opening dates for the older plants. A single encyclopedia entry is the only early date we have, and it is not a city source.

The timeline

Boca Raton water system events, oldest first
WhenWhat happened
August 2, 1924The city is first incorporated, under the name Bocaratone, per Wikipedia. It becomes Boca Raton the next year. This is city history, not water history, and we list it only as a starting point. 1
1928An encyclopedia timeline lists a water plant built that year. No capacity or location is given, and it is not a city source. 19281 is all we have.
Date not foundThe lime softening plant at Glades Road comes into service. The city says only that it has been in operation for over 50 years2.
Early 1990sReclaimed water production starts at the Glades Road complex, the start of the city's irrigation reuse system 3
May 1999The city begins designing a membrane (nanofiltration) addition after years of pilot testing 4
February 2003The city awards the membrane supply contract; the plant would use over over 8,000 elements5 5
August 2004Membrane plant start-up begins, one unit at a time over about six months, building to 40 MGD4. The city's 2025 report says it was built in 20052; we use the city's own history paper for the start 4
Awards, 2002 to 2014Utility awards in those years: 2002, 2010 and 20143. The city lists them in a later application. 3
June 30, 2008The Ocean Outfall program becomes law, forcing Boca and other utilities to reuse wastewater instead of discharging it offshore 3
January 2015The original membranes are replaced with newer, lower-fouling elements. The city's paper reports an energy saving from the new elements 4
2015The state designates the wastewater plant a 100 percent reuse facility, 20153 3
August 2019The only health-based violation in EPA's records for the system, a total coliform finding, returned to compliance September 30, 20196 6
October 1, 2019The oldest fee schedule we compare, see water rates 7
April 10, 2024EPA announces enforceable limits for PFOA and PFOS in drinking water, April 10, 20248 2
2024Sampling and reporting violations for disinfection byproducts and coliform checks, January to June 20246, all closed March 6, 20269 6
May 15, 2025Florida's fluoride law is signed, May 15, 202510 10
July 2, 2025Local press reports Boca's PFAS lawsuit settlement of $32 million11 11
April 24, 2026Engineering bids due for the city's PFAS removal job, April 24, 202612 12
October 1, 2026New city water and sewer rates take effect, October 1, 20267 7

What we could not find

The record is thin in a few spots. We did not find: when the water utility was founded; when the lime softening plant opened; who built the early plant or how big it was; when Boca stopped adding fluoride, or whether it ever started; and an official council resolution for the latest rate steps.

We also hit conflicts. The membrane plant start-up is August 20044 in the city's own paper and 20052 in the city's report. The paper and a later city application give different lifespans for the original membranes. The city's documents also give different figures for how many miles of water main it runs. We use none of these as settled.

What the history tells you

Boca made big early bets: a membrane plant ahead of most utilities and a reuse system years before the law forced it. The cost of that is a plant with aging parts and now a PFAS retrofit. That is our read of the record, and it is an opinion.

For today's picture see what is in Boca water and water projects.

Get a free water report for your address

Start with your ZIP. We show which utility serves it, then call you to go over its latest report and what, if anything, is worth treating.


Your home (optional)




Boca Raton Water Filtration is a trade name of Terragroupe, LLC. We book water filtration installs across Boca Raton, done by a licensed local plumber. We do not sell your details.

Questions people ask

When was Boca Raton's water plant built?

The only early date we found is 19281 from an encyclopedia entry, not a city source. The city's membrane plant started up in August 20044 per its own paper.

Did Boca Raton ever add fluoride?

We could not find out. The city says it does not add fluoride today. Florida's SB 700 was signed May 15, 202510.

Sources

  1. Wikipedia, Boca Raton, Florida, 2026-11
  2. City of Boca Raton, 2025 Annual Drinking Water Quality Report, 2026-05
  3. City of Boca Raton, 2019 AMWA Sustainable Water Utility Management Award Application, 2019
  4. City of Boca Raton's NF Plant: A Plant History (2016 AWWA/AMTA Membrane Technology Conference paper), 2016
  5. WaterWorld, City of Boca Raton awards contract to Hydranautics, May 15, 2003
  6. EPA Envirofacts SDWIS violation records, PWSID FL4500130 (Boca Raton WTP), November 23, 2026
  7. City of Boca Raton Municipal Facilities and Services User Fee Schedule, effective October 1, 2026, October 1, 2026
  8. EPA: Per- and Polyfluoroalkyl Substances (PFAS) NPDWR page, April 10, 2024
  9. EPA Envirofacts SDWIS enforcement actions, PWSID FL4500130, November 23, 2026
  10. ADA News, Florida second state to ban community water fluoridation, 2025-05
  11. The Coastal Star, Boca Raton gets $32 million in forever-chemicals suit settlement, July 2, 2025
  12. City of Boca Raton, List of Respondents for ITB 2026-010-VG, April 24, 2026